Peak Homes

Peak Homes are a system-built, timber-framed type built between 1967 and 1970. They were manufactured by Industrial Building Services (Northern) Ltd to designs by D Thornhill…

  • 5 min read
  • Updated
  • Flettons Surveyors
Peak Homes

Overview

Peak Homes are a system-built, timber-framed type built between 1967 and 1970. They were manufactured by Industrial Building Services (Northern) Ltd to designs by D Thornhill, during a period when the need for rapid housing after the Second World War was still driving a shift towards new building techniques.

The houses are found mainly in suburban areas, as two-storey semi-detached and terraced houses. The design aimed to balance cost against durability, and timber framing with concrete elements was chosen to keep construction time down while keeping the structure sound.

Peak Homes

Typical characteristics & construction

The front and rear walls are vertical timber boarding or timber boards up to first floor level, with tile hanging above. Gable walls are brick throughout, or brick to eaves level with horizontal timber boarding at the apex. Some houses have brick piers at the separating walls, some have gable brickwork returned around the corners, and some have a flat-roofed entrance porch.

The houses stand on a concrete slab with a damp-proof course. The external walls are platform frame construction: storey-height timber frame panels sheathed externally and overlaid with a breather membrane. The front and rear walls are clad directly with vertical timber boarding up to first floor level and tile hanging on timber battens above. The gable wall is clad separately with brick to eaves level and directly with horizontal timber boarding above. Walls are lined internally with plasterboard.

The separating wall is storey-height timber frame panels, and partitions are timber studs lined with plasterboard. The ground floor is concrete, the first floor chipboard on timber joists, and ceilings are plasterboard. The roof is timber trusses with bituminous felt and interlocking concrete tiles.

Variants include ground floor wall panels clad directly with timber boarding below the windows, gable walls of brick throughout returned around the corners, non-loadbearing partitions of Stramit board (a compressed straw panel), and flat roofs of timber joists, chipboard and bituminous felt.

Element Typical construction Inspection focus
Substructure Concrete slab, DPC Moisture at low level
Front and rear walls Platform frame; storey-height panels, breather membrane; vertical timber boarding to first floor level, tile hanging on battens above; plasterboard lining Timber decay, rot, insect infestation
Gable walls Brick to eaves with horizontal timber boarding above, or brick throughout Brickwork deterioration, decay to boarding
Separating wall and partitions Storey-height timber frame panels; timber stud partitions lined with plasterboard (some Stramit board) Moisture ingress or movement shown in linings
Floors Concrete ground floor; chipboard on timber joists at first floor Stability of chipboard and joists
Roof Timber trusses, bituminous felt and interlocking concrete tiles; or flat roof of timber joists, chipboard and felt Condition of tiles or felt, leaks, drainage

Potential hazards & inspection priorities

Primary concern: the timber frame and cladding

Timber framing has advantages in speed and cost, but it brings challenges where it is not properly maintained. Timber is susceptible to rot and insect infestation, particularly when exposed to moisture, and regular inspection and maintenance are essential. The external walls should be assessed first for signs of timber decay and brickwork deterioration, and the condition of the timber frame examined for rot or insect damage.

Secondary concern: flat roofs

The flat roof found on some variants presents its own issues. Bituminous felt degrades over time, leading to leaks and water damage. The condition of the tiles or felt should be examined and drainage confirmed as working properly. Proper drainage and regular roof inspection prevent most of these problems.

Long-term consideration: linings and floors

The plasterboard linings should be inspected for signs of moisture ingress or structural movement. The ground and first floors should be checked for stability, with particular attention to the chipboard and timber joists.

Is this house right for you?

Peak Homes are a distinctive part of late 1960s system building. Their age and materials call for careful evaluation before purchase.

  • Commission a full building survey
  • Check the timber cladding and frame for rot and insect damage
  • Establish the condition and drainage of any flat roof
  • Check the floors and linings for movement and moisture

Recognising the typical characteristics, hazards and inspection points is what allows a buyer to make an informed decision.

Mortgage & resale considerations

Peak Homes are not designated defective under the Housing Defects Act 1984. Their age and construction materials still call for careful evaluation, and buyers should obtain a thorough survey to identify potential issues.

For the surveyor, guidance on assessing these houses is given in "Timber frame housing 1920–1975: inspection and assessment" (BR 282) and in "Supplementary guidance for assessment of timber-framed houses: Part 1 Examination (GBG 11), Part 2 Interpretation (GBG 12)".

What a survey can — and cannot — tell you

A building survey provides an informed assessment of the visible condition and construction of a Peak Homes house. Inspections are non-intrusive and limited to areas that are accessible at the time of inspection.

  • Identify visible decay to timber boarding and deterioration of brickwork and tile hanging
  • Comment on roof coverings, flat roofs and drainage
  • Assess signs of dampness, moisture ingress, and movement in the linings
  • Review the stability of accessible floors
  • Highlight defects that may require repair, monitoring, or further investigation

However, there are limitations to what a survey can determine without intrusive investigation.

  • Confirm the condition of the timber frame concealed behind cladding and linings
  • Assess the breather membrane and sheathing within the walls
  • Determine the full extent of any concealed rot or insect damage
  • Inspect areas that are inaccessible or covered at the time of inspection

Where higher-risk indicators are identified, further specialist or intrusive investigation may be recommended.

Buying a non-traditional home?

See how it was built, and what it needs.

A Level 3 Building Survey looks closely at the structure and condition of the home, records what could and could not be seen, and sets out clear next steps by trade and timing.

Level 3 Building Survey From £595

Get my survey & price What Level 3 covers

  • RICS-regulated firm of surveyors
  • Condition ratings for every part of the home
  • Plain-English advice on what to do next